Search

Asphalt Compaction Calculator

Calculate the optimal number of roller passes, compaction time, and coverage rate for your asphalt paving project. Get customized recommendations based on your specific project parameters.

1Project & Roller Details

Pro Tip

Maintain roller speed between 2-3 mph (3-5 km/h) and ensure asphalt temp is above 175°F (80°C).

2Compaction Results

Passes Needed0 passes
Compaction Time0 minutes
Coverage Rate0 sq ft/hr
Roller Pattern Length0 ft

Compaction Recommendations

Enter project details to see compaction recommendations.

How to Use This Calculator

1

Enter Project Details

  • Select asphalt type from the dropdown menu
  • Enter asphalt thickness and temperature
  • Input lane width and length
  • Choose your desired compaction target
2

Enter Roller Details

  • Input roller weight (typically 8-12 tons)
  • Enter roller drum width (typically 4-7 feet)
  • Specify roller operating speed (typically 2-3 mph)
3

View Results

  • See recommended number of roller passes
  • View estimated compaction time
  • Check coverage rate and roller pattern length
4

Apply Recommendations

  • Review compaction difficulty assessment
  • Follow roller pattern recommendations
  • Download results for your project records

Asphalt Compaction Guide

Understanding Asphalt Compaction

Proper compaction is critical for asphalt pavement performance. It increases density, reduces air voids, and improves resistance to deformation, moisture damage, and aging.

🌡️

Temperature

Asphalt must be compacted above the cessation temp (175°F/80°C).

⚖️

Lift Thickness

Thicker lifts retain heat longer but may require more passes.

🚜

Roller Type & Weight

Heavier rollers provide more compactive effort.

⏱️

Timing

Compaction must be completed while the mix is still hot.

Recommended Roller Patterns

LevelPassesPatternNotes
Low (92-94%)3-5Simple linearTemporary surfaces
Medium (94-96%)5-7Standard with 6" overlapMost applications
High (96-98%)7-9Complex with direction changesHeavy traffic areas
>98%9+Multi-directional, varied ampsAirports, highways

Compaction Best Practices

  • Temp Monitoring: Complete compaction before temp drops below 175°F (80°C) for hot mix.
  • Roller Sequence: Use breakdown, intermediate, and finish rollers.
  • Speed Control: Maintain consistent speed between 2-3 mph (3-5 km/h).
  • Overlap: Maintain consistent overlap (6-12 inches) between passes.
  • Vibration: Use high amplitude for thick lifts, low/static for thin lifts.

Frequently Asked Questions

Need professional help with your asphalt project?

Our team of experts can provide personalized assistance for complex paving projects.