Parking Lot Asphalt Calculator

Estimate asphalt materials, costs, and timeline for your commercial parking lot project with our comprehensive calculator.

Step 1: Enter Parking Lot Dimensions

📏
↔️
Imperial (ft)
Metric (m)

Step 2: Select Asphalt Thickness

🚗
Light Duty
2 inches
For small businesses with light traffic
🏢
Standard Commercial
3 inches
For retail stores and office buildings
🚚
Heavy Duty
4 inches
For shopping centers and truck traffic

Step 3: Select Additional Features

Results

Parking Lot Area:
20,000 sq ft (1,858 m²)
Based on dimensions of 200 × 100 feet
Asphalt Required:
833 tons
Based on 3" thickness of asphalt
Base Material Required:
1,111 tons
Based on 6" thickness of aggregate base
Estimated Cost Range:
$166,600 - $233,200
Includes materials, labor, equipment, and selected features

Parking Spaces Estimate

Your 20,000 sq ft parking lot can accommodate approximately 57 standard parking spaces (9' × 18'), including driving lanes and basic circulation.

Cost Breakdown

Asphalt Material
$70,805 - $91,630
Base Material
$27,775 - $38,885
Site Preparation
$20,000 - $30,000
Concrete Curbing
$10,607 - $14,849
Line Striping
$855 - $1,425
Equipment & Labor
$30,000 - $45,000
Permits & Fees
$1,500 - $4,500
Total Estimated Cost
$166,600 - $233,200

Cost Distribution

Materials (45%)
Labor (35%)
Equipment & Overhead (20%)

Project Timeline

Planning & Permits

2-4 weeks

Site assessment, design, obtaining necessary permits, and scheduling contractors.

Site Preparation

1-2 weeks

Excavation, grading, and installation of drainage systems if required.

Base Installation

3-5 days

Installation and compaction of aggregate base material.

Asphalt Paving

2-3 days

Installation of asphalt layers and compaction.

Curbing & Finishing

2-4 days

Installation of concrete curbs, final grading, and site cleanup.

Striping & Markings

1-2 days

Painting parking spaces, directional arrows, and other markings.

Final Inspection

1 day

Final walkthrough and approval before opening to traffic.

Total Project Duration

For a 20,000 sq ft parking lot, expect a total project duration of approximately 3-6 weeks from planning to completion, depending on weather conditions and contractor availability.

Parking Lot Design Considerations

Standard Parking Space Dimensions

  • Standard Space: 9' × 18' (2.7m × 5.5m)
  • Compact Space: 8' × 16' (2.4m × 4.9m)
  • ADA Accessible Space: 8' × 18' (2.4m × 5.5m) with 5' (1.5m) access aisle
  • Van Accessible Space: 8' × 18' (2.4m × 5.5m) with 8' (2.4m) access aisle

Driving Lane Widths

  • One-Way Traffic: 12'-15' (3.7m-4.6m)
  • Two-Way Traffic: 24'-26' (7.3m-7.9m)
  • Fire Lanes: Minimum 20' (6.1m) width

ADA Requirements

Total SpacesMin. Accessible Spaces
1-251
26-502
51-753
76-1004
101-1505
151-2006

*1 in 6 accessible spaces must be van accessible

Parking Lot Efficiency

  • 90° Parking: Most efficient use of space (300-350 sq ft per space)
  • 60° Parking: Easier navigation but less efficient (325-375 sq ft per space)
  • 45° Parking: Good for one-way traffic but least efficient (350-400 sq ft per space)

Asphalt Pavement Structure

Surface Course (Asphalt) - 3" thickness
Binder Course - 2" thickness
Base Course (Crushed Stone) - 6" thickness
Subbase (Gravel) - 4" thickness
Subgrade (Compacted Soil)
💡

Surface Course

The top layer of asphalt that provides a smooth driving surface and protects the underlying layers from water infiltration and UV damage.

💡

Binder Course

An intermediate layer that provides structural support and helps distribute loads. Often used in thicker pavement sections.

💡

Base & Subbase

Aggregate layers that provide drainage and structural support. Proper compaction of these layers is critical for pavement longevity.

Maintenance Tips for Commercial Parking Lots

Regular Maintenance Schedule

  • Sealcoating

    Apply sealcoat every 2-3 years to protect asphalt from UV rays, water penetration, and chemical spills.

  • Crack Filling

    Inspect for cracks annually and fill them promptly to prevent water infiltration and further deterioration.

  • Pothole Repair

    Address potholes immediately to prevent them from expanding and causing more extensive damage.

  • Line Striping

    Repaint parking space lines and directional markings every 2-3 years or when they become faded.

Preventative Measures

  • Drainage Maintenance

    Keep catch basins and drainage systems clear of debris to prevent water pooling and damage.

  • Regular Cleaning

    Schedule regular sweeping and cleaning to remove debris, dirt, and chemicals that can deteriorate asphalt.

  • Oil Stain Treatment

    Promptly clean oil and chemical spills to prevent them from penetrating and softening the asphalt.

  • Winter Maintenance

    Use plastic snow plow blades and avoid excessive salt/chemical use to prevent damage during winter months.

Long-Term Cost Savings

Regular maintenance can extend the life of your parking lot by 5-10 years and reduce long-term costs by up to 40%. A well-maintained parking lot typically requires major rehabilitation every 15-20 years, compared to 7-10 years for neglected surfaces.